By RWT Robotics Editorial Team Checked against 8 sources Published
COTS stands for commercial off-the-shelf: hardware or software you buy ready-made from the open market and use without redesigning it. Written in lower case, “cots” is usually just the plural of cot, a folding bed or hotel rollaway, and in British English a baby’s crib. You’ll also see COTS used for NASA’s Commercial Orbital Transportation Services program, and “cot” is the standard abbreviation for cotangent.
Key takeaways
- COTS means commercial off-the-shelf: a catalogue product used as sold, with no redesign.
- Under US federal procurement law, an item is COTS only if it is a commercial product, sold in substantial quantities, and offered without modification.
- The NIST/CNSSI definition is looser (“available to the general public”), so a product can be COTS to a security team and still fail the FAR test.
- COTS saves design time but gives you obsolescence, licensing and integration risk, and the vendor controls the roadmap.
- At a hotel, a “cot” is a rollaway bed. Fees vary by property, and some charge per night.
Fact-checked
We checked these key facts against the sources named, on November 25, 2026:
- The 2009 final rule in FAR Case 2000-305 clarified a point that still trips people up (source: govinfo.gov)
- DFARS 212.505 keeps its own list of laws inapplicable to COTS, separate from FAR 12.505 (source: ecfr.gov)
- It was a program from 2006 to 2013 that paid private companies to develop cargo delivery to the International Space Station (source: nasa.gov)
- The original agreements were worth about $278 million for SpaceX and $170 million for Orbital, against an original allocation of roughly $500 million (source: nasa.gov)
- On June 29, 1994, Secretary of Defense William Perry issued a memo telling the Department of Defense to prefer performance and commercial specifications over military specifications and standards (MILSPECs and MILSTDs) (source: acq.osd.mil)
COTS meaning: the short answer
In engineering, software and procurement, COTS means commercial off-the-shelf: a product built for the general market that you buy and use as it is. Everywhere else, “cots” almost always means beds. Context tells you which sense you’re looking at.
Which “cots” do you mean? A quick disambiguation table
| Context | Meaning | Example | Source |
|---|---|---|---|
| Engineering spec, BOM, datasheet | Commercial off-the-shelf parts | “Use COTS single-board computers” | Industry usage, DAU Acquipedia |
| US government contract | Commercially available off-the-shelf item, a defined legal category | “This item qualifies as COTS under FAR 2.101” | Federal Acquisition Regulation |
| Cybersecurity documents | Ready-made product available to the public | “COTS firewall appliance” | NIST CSRC, CNSSI 4009-2022 |
| Space industry | NASA Commercial Orbital Transportation Services (2006 to 2013) | “SpaceX’s Dragon came out of COTS” | NASA SP-2014-617 |
| Hotel booking | Rollaway bed (plural: cots) | “Two cots requested for room 412” | Hotel usage |
| Camping, military, hospital | Folding or portable bed | “Camp cots for the field site” | Merriam-Webster |
| British English | Baby’s crib | “The baby sleeps in a cot” | Merriam-Webster |
| Mathematics | Cotangent (cot x) | “cot ฮธ = 1/tan ฮธ” | Merriam-Webster (abbreviation) |
There is no established slang meaning of “cots”. In a text message it almost always refers to beds.
What commercial off-the-shelf means in practice
A COTS product is designed, built and supported by a vendor for the general market, and you integrate it rather than develop it. A simple test: if you can order it from a catalogue or vendor website by part number, and it works for your job without changes, it’s COTS.
The opposite is custom (also called developmental): something designed for your requirements, where you or a contractor own the design. Most real systems mix the two. A satellite ground station, a hospital information system and a warehouse robot all combine COTS components with custom work.
COTS software examples
COTS software is any packaged or hosted application sold to many customers on the same terms. Typical examples:
- Productivity suites: Microsoft 365, Google Workspace.
- SaaS business platforms: Salesforce CRM, ServiceNow, Workday.
- Operating systems: Windows, commercial Linux distributions such as Red Hat Enterprise Linux, and commercial real-time operating systems (see our explainer on RTOS meaning if you work in embedded).
- Engineering tools: CAD, simulation and PLC programming suites sold under standard licences.
Configuring a COTS product (user roles, workflows, report templates) normally keeps it COTS. Changing its source code, or paying the vendor for a one-off build, moves it toward MOTS or custom.
COTS hardware and parts examples
Hardware is where most engineering COTS lives, and it’s the part software-centric explainers skip. Common COTS hardware includes:
- Fasteners, bearings, linear rails, gearboxes and couplings bought by catalogue number.
- Brushless motors, servo drives and stepper drivers.
- Single-board computers and compute modules, including the multicore embedded processors many mobile robots now need.
- Sensors: lidar units, depth cameras, IMUs, encoders, force-torque sensors.
- Rugged enclosures, power supplies, connectors and standard backplane boards.
COTS in robotics: buy the commodity, build the differentiator
The usual rule in robotics is to buy anything that’s a commodity and build whatever makes your robot different. A mobile robot team rarely gains anything from designing its own lidar or motor driver. It does gain from owning its navigation stack, its gripper or the control software that gives it an edge.
That’s why most research and startup robots, from university arms to robot dogs, run on a COTS backbone: catalogue actuators, a commercial compute module, off-the-shelf cameras and an open middleware layer such as ROS 2. The custom engineering goes into a small share of the bill of materials.
For beginner teams the answer is clear. Start with kits and COTS parts. Custom-machined parts make sense once you know exactly which requirement the catalogue can’t meet.
The official definitions (and why they don’t match)
There are two official definitions that matter, and they disagree. The Federal Acquisition Regulation (FAR) uses a strict three-part legal test, while the cybersecurity glossary used by NIST is much broader.
FAR: commercial product + substantial quantities + no modification
Under the FAR (current through FAC 2026-01, effective March 13, 2026), a commercially available off-the-shelf item is any item of supply that is:
- A commercial product, as defined in paragraph (1) of the “commercial product” definition at FAR 2.101;
- Sold in substantial quantities in the commercial marketplace; and
- Offered to the Government without modification, in the same form in which it is sold in the commercial marketplace.
All three must be true. Subpart 22.18 covers employment eligibility verification (E-Verify), and COTS items are exempt from that requirement. Part 12 points back to the same definition.
FAR 12.103 adds the key relationship. COTS items are a subset of commercial products, so unless a rule says otherwise, every policy that applies to commercial products also applies to COTS.
The 2009 final rule in FAR Case 2000-305 clarified a point that still trips people up. The “substantial quantities” test applies to the item, not to the particular contractor, so several vendors together can meet it.
Did you know?
According to the 2009 FAR Case 2000-305 final rule, a vendor that sells only a few units can still offer a COTS item, because “substantial quantities” is measured for the item across the whole commercial marketplace, not per seller.
So does a COTS item stop being COTS if you tweak it slightly for the customer? Under the FAR, yes. The item is no longer offered “without modification, in the same form” as it’s sold commercially. It may still be a commercial product, because FAR 2.101 allows certain modifications of a type customarily available in the marketplace, and minor modifications. But it loses the extra COTS exemptions.
NIST/CNSSI: the cybersecurity view
The NIST CSRC glossary quotes CNSSI 4009-2022, which defines COTS as “a software and/or hardware product that is commercially ready-made and available for sale, lease, or license to the general public.”
That wording has no sales-volume test and no explicit ban on modification. A niche industrial controller that a handful of plants buy fits the CNSSI definition easily. It might fail the FAR test because it isn’t sold in substantial quantities.
This matters for compliance. A security assessment that labels a component “COTS” is describing its supply chain and patching model. It isn’t making a legal finding that the component gets FAR 12.505 exemptions. If you sell to federal agencies, use the FAR definition for anything contractual.
COTS vs commercial product vs NDI
These three categories nest inside each other, and they’re easy to mix up.
| Source | Definition wording (summarised) | Key test | Applies to |
|---|---|---|---|
| FAR 2.101 (COTS) | Commercial product, sold in substantial quantities, offered without modification | All three conditions | Federal contracts |
| FAR 2.101 (commercial product) | Product of a type customarily used by the public, sold or offered to it, including some modified items | Type of product, marketplace availability | Federal contracts |
| FAR 2.101 (nondevelopmental item) | Previously developed item used by a government agency or a cooperating foreign government, with or without minor modification | Already developed, not built for this contract | Federal contracts |
| CNSSI 4009-2022 via NIST CSRC (COTS) | Ready-made product available for sale, lease or licence to the public | Public availability | Security and assurance work |
A non-developmental item (NDI) has already been developed but isn’t necessarily commercial. It might be a system built for one government agency and reused by another. Since a 2019 FAR rule, NDIs developed exclusively at private expense and sold in substantial quantities to multiple foreign governments can be treated as commercial items.
COTS vs MOTS vs GOTS vs NOTS vs custom
These acronyms describe who builds the product and who controls changes to it. COTS is vendor-built and vendor-controlled. Every other category trades some of that convenience for control.
| Term | Stands for | Who builds/controls it | Modifiable? | Typical example | Main risk |
|---|---|---|---|---|---|
| COTS | Commercial off-the-shelf | Commercial vendor | Configuration only | Microsoft 365, a catalogue lidar | Obsolescence, lock-in |
| MOTS | Modified (or modifiable, or military) off-the-shelf | Vendor base, modified by vendor or integrator | Yes | A COTS radio ruggedised for a vehicle | Losing upgrade path and COTS status |
| GOTS | Government off-the-shelf | Government agency or its contractor | Yes, by the government | NASA OpenMCT | Thin support, small user base |
| NOTS | Niche off-the-shelf (usage varies) | Varies by usage | Varies | Specialist products | Limited availability |
| NDI | Non-developmental item | Previous developer | Minor changes allowed | A system reused from another agency | May not be commercial at all |
| Custom | Developmental | You or your contractor | Fully | A purpose-built gripper | Cost, schedule, sustainment burden |
MOTS starts as a COTS product and gets changed: new firmware, a hardened enclosure, an added interface. The “M” is read as modified, modifiable or military depending on the community.
GOTS is software or hardware developed by or for a government agency, which owns or controls it. NASA’s OpenMCT, an open-source mission control framework, is a commonly cited example.
NOTS has no single standard meaning. Some writers use it for “niche off-the-shelf”.
So what’s the difference between COTS and custom parts? Ownership of the design. With COTS you buy a part number and accept the vendor’s design. With custom, who holds the design rights and carries future changes depends on your contract.
COTS in government procurement in 2026
Qualifying as COTS changes a federal contract in a concrete way: certain listed laws do not apply, subject to conditions and exceptions. That’s the main reason contractors argue about whether an item meets the FAR test.
Laws that don’t apply to COTS
FAR 12.503 addresses the applicability of certain laws to contracts for commercial products and commercial services, FAR 12.504 addresses laws that do not apply to subcontracts for commercial products or commercial services, and FAR 12.505 addresses certain laws inapplicable to COTS items. Two well-known effects are the E-Verify exemption tied to subpart 22.18 and relief from the Buy American component test for COTS items.
Defense contracts add a second layer. DFARS 212.505 keeps its own list of laws inapplicable to COTS, separate from FAR 12.505. It includes 10 U.S.C. 391 (cyber incident reporting) and 10 U.S.C. 4872 (restrictions on sensitive materials from non-allied nations).
Engineer's note
If you sell into the Department of Defense, check both FAR 12.505 and DFARS 212.505. The DoD list is separate, and reading only the FAR list will give you the wrong exemptions.
What the FAR overhaul changes for Part 12
The Revolutionary FAR Overhaul is a rewrite of the whole regulation led by the FAR Council and GSA. On September 18, 2026, the FAR Council published a proposed rule in the Federal Register covering Parts 8, 12, 13, 15, 38, 44 and 51. Comments closed on October 19, 2026.
For commercial buying, the proposed rule keeps the solicitation provisions and clauses at 52.212-1, 52.212-2 and 52.212-4. It removes the omnibus representations provision 52.212-3 and the long statutory clause 52.212-5. It also moves simplified procedures for commercial purchases from Part 13 into Part 12, and folds Parts 38 and 51 into Part 8 and GSA’s supplement.
Reality check
The September 2026 Part 12 rewrite is a proposed rule, not final text. Until a final rule is published, the codified FAR (FAC 2026-01) and any agency class deviations govern your contracts.
The core COTS definition isn’t the target of the overhaul. What changes is how the exemptions are listed and which clauses carry them, so expect to re-check your flow-downs once the final rule lands.
Why COTS took over: from MILSPEC to the Perry memo
COTS became the default in defense because of one policy change. On June 29, 1994, Secretary of Defense William Perry issued a memo telling the Department of Defense to prefer performance and commercial specifications over military specifications and standards (MILSPECs and MILSTDs).
GAO’s follow-up report (GAO/NSIAD-95-14) said the memo formally accepted a Process Action Team report on specifications and standards and directed the services and agencies to implement it. After the memo, using a military spec required a waiver. A 2005 DoD memo later dropped that waiver requirement, but by then commercial-first buying was settled practice.
The vocabulary hasn’t aged gracefully. In 2014 the trade publication Military & Aerospace Electronics asked its readers to suggest replacement terms for COTS, a sign of how unpopular the label had become in defense electronics.
The real costs of COTS (an engineer’s view)
COTS is usually the right call, but the price on the quote isn’t the full cost. You trade design effort for dependence on a vendor whose product life cycle, roadmap and licence terms you don’t control.
Benefits: time, tech insertion, life-cycle cost
- Schedule. A catalogue part ships in days or weeks. A custom design needs requirements, drawings, prototypes and qualification.
- Technology insertion. Commercial markets refresh fast, so COTS lets you pick up better sensors and processors without funding their development.
- Proven field history. A part sold by the thousand has had its early failures found by other customers.
- Lower upfront cost. Development cost is spread across the vendor’s whole market.
Risks: obsolescence, lock-in, licensing, integration
The Defense Acquisition University’s Acquipedia notes two structural problems. Commercial product life cycles are usually much shorter than military ones, and vendors don’t have to provide design information. Defense programs track the first problem as DMSMS (Diminishing Manufacturing Sources and Material Shortages).
In a robot, this shows up as:
- Mid-program discontinuation. The depth camera or lidar your perception stack is tuned for reaches end of life two years into a ten-year product.
- Silent revisions. The same model number ships with a new chip, firmware or mechanical tolerance from one year to the next.
- Driver and OS coupling. A vendor SDK supports only one older OS release or ROS 2 distribution, which pins your whole software stack.
- Proprietary functions. Black-box filtering or calibration you can’t inspect, which is a real problem for safety cases.
- Licence limits. Terms that exclude medical, defense, safety-critical or life-support use.
- Supply-chain opacity. You may not know where subcomponents come from, which matters for DFARS sourcing rules.
- Constrained trade space. You design around the part’s envelope, connector and power draw instead of your own optimum.
| Factor | COTS | Custom | What to check |
|---|---|---|---|
| Upfront cost | Low | High (design + tooling) | Total cost including engineering hours |
| Lead time | Days to weeks | Weeks to months | Distributor stock, factory lead time |
| Design data | Rarely provided | You own it | Drawings, interface control documents |
| Obsolescence | Vendor decides | You decide | EOL notice period, last-time-buy policy |
| Modification | Configuration only | Unlimited | Whether changes void warranty or COTS status |
| Licensing | Vendor terms | Your terms | Field-of-use and export clauses |
| Long-term support | Vendor roadmap | Your team | Support term vs your product’s life |
Is it cheaper to buy COTS or have the part machined? Count everything. Suppose a catalogue bracket costs $40 and a custom one costs $25 per unit to machine. The custom part also needs perhaps ten engineering hours for design, drawings and a first-article check. At typical engineering labour rates, that time costs more than the per-unit saving across hundreds of units. The custom part wins only at volume, or when the COTS part forces compromises elsewhere in the design.
Engineer's note
Lock the exact part number, hardware revision, firmware version and driver version in your BOM. Year-to-year model changes under an unchanged name are a documented COTS failure mode.
Make-vs-buy checklist before you pick a COTS part
- Confirm the part meets the requirement unmodified. If you need to modify it, cost it as MOTS.
- Ask the vendor for its product-change notification policy and end-of-life notice period.
- Compare the vendor’s expected production life with your product’s support life.
- Identify a second source or a drop-in alternative for anything mission-critical.
- Read the licence for field-of-use, export and redistribution limits.
- Check what interface data you get: mechanical drawings, electrical specs, protocol docs.
- Check software support: OS versions, SDK update cadence, source availability.
- For federal work, confirm whether the item meets the FAR COTS test, not only the CNSSI one.
- Plan a last-time buy or redesign budget before the part goes end of life.
Our COTS sensor got discontinued mid-project; how do you plan for that? Abstract the hardware behind your own interface, so the rest of the stack doesn’t depend on one vendor’s SDK. Keep spares from a last-time buy. Validate a replacement in simulation early: teams that keep digital twins of their robots can swap a sensor model and see what breaks before they buy hardware.
NASA’s other COTS: Commercial Orbital Transportation Services
NASA’s COTS has nothing to do with procurement categories. It was a program from 2006 to 2013 that paid private companies to develop cargo delivery to the International Space Station.
NASA’s Phase 1 awards in August 2006 went to SpaceX and Rocketplane Kistler. Rocketplane Kistler missed its milestones and its agreement was terminated in 2007. Orbital Sciences took its place in February 2008. The original agreements were worth about $278 million for SpaceX and $170 million for Orbital, against an original allocation of roughly $500 million. NASA’s final report (SP-2014-617) records that the program concluded in November 2013.
SpaceX’s Dragon and Orbital’s Cygnus cargo spacecraft both came out of the program, and both went on to fly operational resupply missions.
Cots the bed: hotel rollaways, camping cots and British cots
As an ordinary word, a cot is a small, usually collapsible bed, often fabric stretched over a frame. In British English, a cot is a baby’s crib. Merriam-Webster also lists an older, unrelated “cot” meaning a small cottage or shelter.
Did you know?
According to Merriam-Webster, “cot” in the bed sense comes from the Hindi and Urdu word khฤแนญ, meaning bedstead, and its first known use in English dates to 1634.
What does “cots” mean at a hotel?
At a US hotel, a cot usually means a rollaway: a foam mattress on a folding metal frame that staff wheel into your room. There’s no standard fee. Charges of around $10 to $20 are commonly reported, but One Mile at a Time documented a New York hotel charging $100 per night plus tax. Many hotels charge per night, so check before you book a multi-night stay.
To get one, request it when you book and again before arrival. IHG advises guests to request extras such as rollaways early and to ask the hotel to confirm availability, because each property only has a few. Room size and occupancy limits also matter: some rooms have no space for one.
Can you bring your own air mattress instead? It depends on the hotel. Occupancy limits apply regardless of who supplies the bed, so ask the front desk first.
Before you travel
Ask whether the rollaway fee is per night or per stay, and get the confirmation in writing. Rollaways run out quickly on busy weekends.
Cot vs crib vs rollaway
| Term | US meaning | UK meaning |
|---|---|---|
| Cot | Folding camp or portable bed | Baby’s crib |
| Crib | Baby’s bed with high sides | Same (also “cot”) |
| Rollaway | Folding hotel bed on wheels | Often called a “Z-bed” or “extra bed” |
| Travel cot | Portable bed | Portable baby crib (US “pack ‘n play”) |
Camping and military cots are raised fabric-on-frame beds that keep you off cold or wet ground.
FAQ
What does COTS stand for?
COTS stands for commercial off-the-shelf. It describes ready-made hardware or software bought from the commercial market and used without redesign. In US federal contracts the full term is “commercially available off-the-shelf.”
What are COTS in software?
COTS software is packaged or hosted software sold to many customers on standard terms, such as Microsoft 365, Salesforce or a commercial operating system. You configure it but don’t change its code.
What do COTS parts mean in engineering?
COTS parts are catalogue components bought by part number: fasteners, bearings, motors, single-board computers, sensors, power supplies. Engineers use them to save design time and reserve custom work for the parts that set the product apart.
What are cots in a hotel?
They’re rollaway beds: folding frames with foam mattresses. Fees vary by property, from free to over $100 a night, and you should request one early.
What is the difference between COTS and MOTS?
COTS is used exactly as sold. MOTS (modified off-the-shelf) is a COTS product that has been altered, for example with new firmware or a ruggedised housing. Under the FAR, a modified item loses COTS status, though it may remain a commercial product.
What is the difference between COTS and GOTS?
COTS is built and controlled by a commercial vendor for the public market. GOTS (government off-the-shelf) is developed by or for a government agency, which controls it. NASA’s OpenMCT is a common example.
What is a COTS item under the FAR?
It’s an item of supply that is a commercial product, sold in substantial quantities in the commercial marketplace, and offered to the government without modification in the same form it’s sold commercially. The commercial product definition it builds on appears in FAR 2.101.
Is open-source software COTS?
Under the CNSSI 4009-2022 wording, open-source software counts only if it is ready-made, available for sale, lease or license to the general public, and not modified for a specific organization. Under the FAR, whether a particular package counts as a commercial product or COTS item is a contracting question, so confirm with the contracting officer before you rely on any exemption.
What is the difference between COTS and a commercial product?
Every COTS item is a commercial product, but not every commercial product is COTS. A commercial product can include certain modifications. COTS also requires substantial sales volume and no modification, and in return it gets extra exemptions under FAR 12.505.
What does “cots” mean in slang?
It has no established slang meaning. In casual writing, “cots” is the plural of cot (a bed). In technical writing, COTS is the acronym for commercial off-the-shelf.
The decision that matters most
For engineers, the useful question is how long you can live with a COTS part before the vendor changes it or stops making it, more than whether it counts as COTS. Before your next design review, pull the three parts your system can least afford to lose. Get end-of-life policies for each and name a fallback. Owning that list is what keeps a COTS-heavy robot shippable for years.
Credits and sources
By RWT Robotics Editorial Team
- Facts were checked against the sources below before publication.
- Published
Checking and sources
- Researched from 8 sources, listed below.
- Facts are checked against those sources; anything we cannot confirm is corrected, labelled or removed.
Sources (8)
- FAR 22.1801 Definitions (acquisition.gov) (acquisition.gov)
- FAR 12.103 Commercially available off-the-shelf (COTS) items (acquisition.gov)
- FAR 12.505 Applicability of certain laws to contracts for the acquisition of COTS items (acquisition.gov)
- Federal Acquisition Regulation: Revolutionary FAR Overhaul Parts 8, 12, 13, 15, 38, 44 and 51 (federalregister.gov)
- Wiley: FAR Council Issues Second Round of FAR Overhaul Proposed Rules (wiley.law)
- Nextgov: FAR Overhaul targets commercial buying and negotiations in newest rewrite (nextgov.com)
- FAR Case 2000-305: Commercially Available Off-the-Shelf (COTS) Items (federalregister.gov)
- FAR: Definition of Commercial Item (2019) (federalregister.gov)